scope of work
What do you need done?
the guide
Roof, sun and service first
A good proposal starts with the roof’s age and condition, shading from trees and neighboring buildings, the direction and pitch of each roof plane, and whether the electrical panel can take a solar connection. Panels are meant to stay up for decades, so a roof near the end of its life is usually replaced first.
What affects the price
System size, panel and inverter type, roof type and complexity, any panel or service upgrade, battery storage, ground-mount trenching, and whether you buy outright, finance, lease or sign a power purchase agreement.
Own, lease or buy the power
Owning the system means you keep any incentives and credits but also the upkeep. A lease or power purchase agreement means a third party owns it, and the contract terms — escalators, length, and what happens when you sell the house — matter as much as the monthly figure. Federal incentives for homeowner-owned solar changed in 2025, so confirm what currently applies with a tax adviser rather than a sales sheet.
Rules and paperwork in Pennsylvania
- Pennsylvania’s Home Improvement Consumer Protection Act requires most contractors who perform home improvements to register with the Attorney General’s office and to give you a written contract for any job over $500. The registration number belongs on the estimate and the contract — ask for it.
- Building permits in Pennsylvania are issued under the Uniform Construction Code by each municipality or the inspection agency it appoints, so the local building or codes office decides what needs a permit and an inspection.
- Permitted electrical work is inspected by the municipality or an approved third-party electrical inspection agency before it is covered up or energized.
- Pennsylvania’s Alternative Energy Portfolio Standards Act and the Public Utility Commission’s rules require a home solar system to go through the electric distribution company’s interconnection process before it operates connected to the grid, and they set the terms for net metering of residential systems up to 50 kilowatts.
Sources: Pennsylvania Office of Attorney General — Home Improvement Consumer Protection Act; Pennsylvania Department of Labor & Industry — Uniform Construction Code; Pennsylvania Department of Labor & Industry — Uniform Construction Code; Pennsylvania Public Utility Commission — Alternative Energy Portfolio Standards Act. Rules change — confirm current requirements with the agency and with your municipality.
Questions to ask before you hire
- How did you estimate my production, and what shading did you account for?
- Who handles the permit and the utility interconnection application?
- What do the panel, inverter and workmanship warranties each cover, and for how long?
- What is your Pennsylvania Home Improvement Contractor registration number?
Frequently asked questions
Do I need a permit for solar panels in my town?
Yes in most cases. Expect a building and electrical permit from the municipality, plus the utility’s interconnection approval before the system is switched on. The installer usually handles both.
Will solar panels work during a power outage?
A standard grid-tied system shuts off during an outage so it cannot send power onto lines being repaired. Backup power requires a battery or other equipment designed to isolate the house.
Will panels damage my roof?
Properly flashed mounts should not leak. Ask how penetrations are sealed and who is responsible if a leak appears at a mount.
the crew
Verified solar panels contractors
We are still onboarding verified solar panels contractors. You can submit a request and we will tell you honestly if we cannot match it — your details are never shared unless a verified contractor is available.
This trade typically requires a license or state registration. Contractors receive solar panels requests only after we have reviewed theirs.